Curriculum Vitae

Rizky Ananda Latief
Media Social
Iam a Quantity Surveyor & Bar Bending Schedule Experience in providing Back-Up Quantity (Structure & Architecture), Manage Time Schedule, Fully equip with Autocad and Microsoft Excel, Microsoft word and Microsoft Project, Publish ShopDrawing Bar Bending Schedule on Site Project, Remusere progres to owner.
Februari 2020
Universitas Bung Hatta
D3 • Teknik Ekonomi Konstruksi (Quantity Surveyor) • IPK 3.16
Desember 2022 - Sekarang
Quntity Surveyor
PT Aji Konstruksi Utama • Contract Base
• Conducting cost analysis of materials, labor, and equipment required for the project.
• Evaluating and comparing bids from subcontractors and suppliers.
• Monitoring and controlling project costs during construction execution.
• Identifying potential cost savings and providing recommendations for cost optimization.
• Performing quantity take-offs based on construction drawings and project specifications.
• Reviewing and evaluating contract documents, including terms and conditions, payment clauses, and technical requirements.
• Managing variation claims (variation orders) and changes in project scope.
• Preparing and reviewing interim payment certificates (IPC) for clients and subcontractors.
• Collaborating with the project team, including Engineering and project managers, to ensure alignment in project planning and execution.
• Coordinating with subcontractors and suppliers to ensure the delivery of materials and services meets project requirements.
Agustus 2022 - Desember 2022
Site Engineering
PT Adirakreasi Indonesia • Contract Base
• Scheduling the method of implementation and breakdown the monthly and weekly
activities
• Coordination with the project owner regarding the determination of the material
schedule and the approval of materials that will be used
• Arrange and provide shop drawings
• Determination of effective and inexpensive work
• Supervise the implementation of work on the project
• Coordination with Project Manager of time and cost deviations
• Conduct intensive monitoring of the stages of implementation of daily and weekly
activities and also financial reports
• Coordinate the preparation of periodic project implementation progress reports
• Evaluate quality and determine plan to avoid deviations that are likely to occur
• Prepare data for compiling a schedule, including activity items, timeframe, materials
and equipment
Media
Agustus 2022 - Desember 2022
Site Engineering
PT Adirakreasi Indonesia • Contract Base
• Scheduling the method of implementation and breakdown the monthly and weekly
activities
• Coordination with the project owner regarding the determination of the material
schedule and the approval of materials that will be used
• Arrange and provide shop drawings
• Determination of effective and inexpensive work
• Supervise the implementation of work on the project
• Coordination with Project Manager of time and cost deviations
• Conduct intensive monitoring of the stages of implementation of daily and weekly
activities and also financial reports
• Coordinate the preparation of periodic project implementation progress reports
• Evaluate quality and determine plan to avoid deviations that are likely to occur
• Prepare data for compiling a schedule, including activity items, timeframe, materials
and equipment
Media
September 2021 - Juli 2022
Quntity Surveyor
PT Hutama Karya (Persero) • Contract Base
• Planning back quantity structure and architecture
• Calculating the material needed for building work
• Direct coordination with procurement for material needs information on project site
• Controlling the use of material accordance estimator list
• Scheduling worker’s timetable on project site
• Re-checking each new shop drawing and contract change order
• Administration Quantity Surveyor of monthly report, weekly report, and daily report
Media
Juli 2022
Microsoft Project
PT Mektan Babakan Tujuh Konsultan • 078/SERT-ENG/MBT/JKT/2022