Petroleum Engineering graduate with a strong foundation in reservoir engineering, drilling engineering, production, and data analysis. Proven experience in geothermal reservoir characterization and geothermal well testing. Proficient in conducting well test, analyzing reservoir data, and reservoir flow modeling. Passionate about contributing to the development of clean and sustainable energy resources, I am seeking a challenging role where I can collaboration with a dynamic team and leverage my expertise to advance sustainable energy solutions and innovation.
Oktober 2024
Universitas Pertamina
S1 • Teknik Perminyakan • IPK 3.1
Juni 2024 - Juli 2024
Reservoir Characterization & Surveilence Intern
PT Pertamina Geothermal Energy • Magang
1. Performing wellbore modeling of UBL – X and UBL – Y well using SwelFlo which is use as a production forecasting, predict production decline, and others
2. Finalizing UBL – X and UBL – Y well production test result data using Russell James equation. The result formed in deliverability curve which consist of total mass flow rate versus well head pressure and the maximum discharge point
3. Find the maximum discharge pressure of UBL - X and UB - Y well by deliverability curve which has been designed through flow modelling process using SwelFlo
4. Determine actual generating potential of UBL - X and UBL - Y well and steam consumption using the result of calculation production data
5. Find actual contribution of UBL - X and UBL – Y to power plant by converting the hot fluid produced phase to electric
Media
Februari 2024 - Juli 2024
Well Test & Measurement Engineer
PT Pertamina Geothermal Energy • Magang
1. Collecting data of UBL - X and UBL - Y well using PTS (Pressure Temperature Spinner) survey and Heating Up Survey to find pressure, temperature, flowrate, and feed zone
2. Collecting UBL - X and UBL - Y well physical data consist of casing used and well production test data consist of well head pressure, lip pressure, etc. The data are used for estimate potential of geothermal well using flow simulator SwelFlo
September 2023 - Oktober 2023
Well Test & Measurement Engineer Intern
PT Pertamina Geothermal Energy Tbk Area Ulubelu • Magang
1. Observing the geothermal production line from the well head to the geothermal power plant
2. Observing UBL – X well production test process to determine the potential
3. Processing data production test using the Russell James equation to obtain the value of water mass flow rate, total mass flow rate, and Y constant value with output in the form of deliverability curve
4. Determine the temporary potential of the geothermal well and determine the maximum discharge pressure point