Curriculum Vitae

Muhammad Redho Kristianto
Media Social
A fresh graduate in Electrical Engineering who strives to enrich experiences and knowledge. Known as an active, adaptive individual who enjoys solving complex problems. Skilled in electrical systems, programming, and engineering software. Experienced in various industrial projects, including electrical systems and embedded systems. I am seeking opportunities to enhance my skills and grow professionally.
September 2024
INSTITUT TEKNOLOGI SUMATERA
S1 • Electrical Engineering • IPK 3.8
Maret 2023 - Juni 2023
Project Engineer
PT Lembaga Energi Indonesia • Magang
Involved in the 1,881 MWp solar power plant development, focusing on planning, design, and management. Designed the electrical system, reducing costs by 15%. Prepared the BoQ saving 10-15%. Conducted a feasibility analysis, achieving 18% IRR and IDR 14.25 billion NPV. Used the S curve to accelerate project completion by 25.6%. Oversaw materials and work, coordinating with the team to meet target.
Media
Februari 2023 - Juni 2023
Technical and Bussiness Development
Kementerian Energi dan Sumber Daya Mineral RI • Magang
Studied renewable energy potential in Indonesia to identify profitable opportunities. Surveyed 50 respondents, with 88% interested in adoption. Developed financial models and feasibility studies, ensuring 100% viability. Helped implement rooftop solar plants over 200 kWp. Trained on solar installation, including planning, preparation, and reporting.
Media
Januari 2023 - Januari 2024
Project Engineer
PT East West Seed Indonesia • Magang
Managed a team of 6 groups to create an automated fertilization mixing machine. Designed power and embedded systems using Raspberry Pi, ESP32, and sensors. Developed control algorithms in Python and sensor programming in C. Achieved 98–99% accuracy by calibrating 4 sensors. Integrated 3 subsystems into one control system and successfully led commissioning with 100% reliability.
Media
Juli 2018 - September 2018
Electrical Technician
PT Bukit Asam Tbk • Magang
Installed a 20 kV electrical network spanning 2 km and a 6 kV power supply for a Sulzer pump to ensure reliable operation. Added 2 grounding systems in the motor control center for safety. Maintained 3 transformers to enhance reliability. Repaired over 8 streetlights in 1 month, boosting illumination by 30%.